Data center development is moving quickly across Missouri, raising important questions about energy demand, water use, tax incentives, land use and the impact on local communities and ratepayers.

This page is a private working space for our colleagues and their staff. It is not public facing. Here you will find every briefing we have recorded, the presentations shared by experts and stakeholders, and curated links to research and news.

Good legislation comes from careful study. Let's learn together, ask hard questions and get this right for Missouri.


October 21st Zoom Meeting
Missed a session? Catch up on the full session and download slides below.
Mo Public Utilities Alliance


October 14th Zoom Meeting
Missed a session? Catch up on the full session and download slides below.
October 7th Zoom Meeting
Missed a session? Catch up on the full session and download slides below.
Mo American Water & Mo Rural Water Association
  • MAW summary of draft legislation - System Grade Card & Transparency
  • General concerns for rural water systems from MRWA Director.
September 30th Zoom Meeting
Missed a session? Catch up on the full session and download slides below.
September 15th Meeting
The initial meeting was held in the Senate Lounge and not recorded. 
Additional Info From Meta
Maximum daily water usage at KC Data Center

The Meta Kansas City data center's maximum daily water usage, per an agreement with KC Water, is 1.3 million gallons per day, well below the unsubstantiated claims on the missouridatacenters.org website.  

To the right is a screenshot of the table from the water agreement with KC Water. Now that the data center is operational, and all offsite conveyance infrastructure has been completed (paid for by Meta), we are operating in “Tier 3” of our agreement.

It is important to understand what that number represents: it is a contracted peak-day allocation — an upper bound reserved with the water utility to ensure capacity is available on the single hottest, driest day of the year. It does not represent a typical day, nor is it a number that should be multiplied by 365 days to estimate annual water withdrawals as that would substantially overstate actual usage. 

Actual water use varies significantly year to year based on temperature, humidity, and other climate conditions, and on most days, the data center will only use a small fraction of the peak-day allocation. We reserve the peak-day capacity precisely so we never place unplanned demand on the system, and we pay the full cost of the capacity we reserve.
Water usage and transparency

We report actual annual water withdrawals for each operational data center in our annual Sustainability Report and accompanying Environmental Data Index, and that data is independently assured by a third party. These links are for last year's report, based on 2024 operational data, which does not include our Kansas City data center since it did not become operational until 2025. Our Kansas City data center water data will be reported in these tables with the release of our next Sustainability Report (expected in the next handful of weeks), and in each report going forward. And with this year's report, we will also be reporting water consumption by operational data center. Our annual report provides actual, verified annual figures rather than projections.

Offsite water and wastewater infrastructure

Meta has paid for more than $10.5 million in offsite water and wastewater conveyance infrastructure in connection with our Kansas City data center. Upon construction completion, the infrastructure was inspected and accepted by KC Water, who incorporated it into their system. This infrastructure directly supports additional growth and economic development in the region, as Meta’s total demand on the infrastructure is a small percentage of the overall capacity added. Throughout the design, permitting, and construction process, KC Water did not raise concerns with us about capacity or conditions at their wastewater treatment plant. That said, we would welcome further conversation with KC Water directly. If you can connect us with the appropriate team at KC Water, we would be glad to engage.